3
Site plan
One row per building. Type and subtype are not labels — they decide occupancy class, fixture density, electrical load and grease exposure, and those decide fees. A gym out-plumbs a much larger apparel box; a theater is assembly occupancy, which lowers the sprinkler threshold.
| Name | Type | Size (SF) | Type-specific | Build responsibility | ||
|---|---|---|---|---|---|---|
| Total | ||||||
4